You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@fineract.apache.org by "Petri Tuomola (Jira)" <ji...@apache.org> on 2021/09/21 13:54:00 UTC

[jira] [Resolved] (FINERACT-1316) Interest calculation going wrong for advance/late payments

     [ https://issues.apache.org/jira/browse/FINERACT-1316?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Petri Tuomola resolved FINERACT-1316.
-------------------------------------
    Resolution: Fixed

> Interest calculation going wrong for advance/late payments
> ----------------------------------------------------------
>
>                 Key: FINERACT-1316
>                 URL: https://issues.apache.org/jira/browse/FINERACT-1316
>             Project: Apache Fineract
>          Issue Type: Bug
>          Components: Loan
>    Affects Versions: 1.4.0
>            Reporter: bharath gowda
>            Assignee: Avik Ganguly
>            Priority: Critical
>             Fix For: 1.6.0
>
>         Attachments: 22.png, product config.png
>
>
> for a loan product with daily interest calculation, when an advance/late/partial repayments are made, interest calculation is going wrong, which is resulting in 3 major issues
>  
>  # repayment schedule payment allocation is going wrong
>  # The next prepayment interest calculation is wrong
>  # The interest of all the subsequent installments is calculating wrong because of the wrong principal balance.
> To reproduce, create a loan product with interest calculation set to daily(check attachment for complete product configuration)
> create->disburse a loan with the loan product
> do a early repayment to the loan and check the calculation
>  refer attachment for the sample
>  



--
This message was sent by Atlassian Jira
(v8.3.4#803005)