You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Till Rohrmann (Jira)" <ji...@apache.org> on 2019/10/08 06:00:03 UTC
[jira] [Closed] (FLINK-14284) Add shut down future to Dispatcher
[ https://issues.apache.org/jira/browse/FLINK-14284?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Till Rohrmann closed FLINK-14284.
---------------------------------
Resolution: Done
Done via 1c5f7558626bb8c301d564c0cbc15126d6cc1731
> Add shut down future to Dispatcher
> ----------------------------------
>
> Key: FLINK-14284
> URL: https://issues.apache.org/jira/browse/FLINK-14284
> Project: Flink
> Issue Type: Improvement
> Components: Runtime / Coordination
> Affects Versions: 1.10.0
> Reporter: Till Rohrmann
> Assignee: Till Rohrmann
> Priority: Minor
> Labels: pull-request-available
> Fix For: 1.10.0
>
> Time Spent: 20m
> Remaining Estimate: 0h
>
> In order to better integrate with the {{DispatcherRunner}}, all {{Dispatchers}} should report their final application status via a shut down future (see FLINK-14281). Therefore, I propose to a shut down future to the {{Dispatcher}}.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)