You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Dick Cavender (Jira)" <ji...@apache.org> on 2019/09/26 18:05:08 UTC
[jira] [Closed] (GEODE-6905) Do not need to wait for initialization
of distributed region before schedule region sync timed task
[ https://issues.apache.org/jira/browse/GEODE-6905?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Dick Cavender closed GEODE-6905.
--------------------------------
> Do not need to wait for initialization of distributed region before schedule region sync timed task
> ---------------------------------------------------------------------------------------------------
>
> Key: GEODE-6905
> URL: https://issues.apache.org/jira/browse/GEODE-6905
> Project: Geode
> Issue Type: Bug
> Components: regions
> Affects Versions: 1.10.0
> Reporter: Eric Shu
> Assignee: Eric Shu
> Priority: Major
> Fix For: 1.10.0
>
> Time Spent: 20m
> Remaining Estimate: 0h
>
> The wait for initialization is only needed before the actual region sync operation. There is no need to wait for initialization just to schedule the region sync.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)