You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@maven.apache.org by "wei cai (Jira)" <ji...@apache.org> on 2023/02/24 13:15:00 UTC

[jira] [Comment Edited] (MRESOLVER-7) Download dependency POMs in parallel in BF collector

    [ https://issues.apache.org/jira/browse/MRESOLVER-7?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17693194#comment-17693194 ] 

wei cai edited comment on MRESOLVER-7 at 2/24/23 1:14 PM:
----------------------------------------------------------

[~knut] 

Thanks for your feedback! This is a closed JIRA, it's not appropriate to put new comments here, let's discuss about BF + Skipper + Parallel downloading in https://issues.apache.org/jira/browse/MRESOLVER-324

For your reported issue, it is related with https://issues.apache.org/jira/browse/MRESOLVER-325

 


was (Author: wecai):
[~knut] 

Thanks for your feedback! This is a closed JIRA, let's discuss about BF + Skipper + Parallel downloading in https://issues.apache.org/jira/browse/MRESOLVER-324

For your reported issue, it is related with https://issues.apache.org/jira/browse/MRESOLVER-325

 

> Download dependency POMs in parallel in BF collector
> ----------------------------------------------------
>
>                 Key: MRESOLVER-7
>                 URL: https://issues.apache.org/jira/browse/MRESOLVER-7
>             Project: Maven Resolver
>          Issue Type: Improvement
>          Components: Resolver
>    Affects Versions: Aether 1.0.2
>            Reporter: Harald Wellmann
>            Assignee: Tamas Cservenak
>            Priority: Major
>             Fix For: 1.9.0
>
>         Attachments: resolve_deps.png, resolver.log
>
>          Time Spent: 40m
>  Remaining Estimate: 0h
>
> h3. Background
> When building a project with dependencies not yet available in the local repository, I noticed that Maven 3.3.9/Aether 1.0.2 first downloads the dependency POMs _sequentially_ and then proceeds downloading the dependency JARs with up to 5 threads _in parallel_.
> Due to this, when first building a project with a large number of dependencies, downloading a large number of small POMs may take a lot longer than downloading the much larger JARs, or even longer than building the project itself, especially when a repository manager is used which increases the download latency.
> h3. Enhancement
> Download POMs of (transitive) dependencies in parallel to significantly speed up initial builds of large projects.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)