You are viewing a plain text version of this content. The canonical link for it is here.
Posted to common-dev@hadoop.apache.org by "Christian Kunz (JIRA)" <ji...@apache.org> on 2008/09/26 21:59:44 UTC

[jira] Updated: (HADOOP-4295) job-level configurable mapred.map.tasks.maximum and mapred.reduce.tasks.maximum

     [ https://issues.apache.org/jira/browse/HADOOP-4295?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Christian Kunz updated HADOOP-4295:
-----------------------------------

    Summary: job-level configurable mapred.map.tasks.maximum and mapred.reduce.tasks.maximum   (was: mapred.map.tasks.maximum and mapred.reduce.tasks.maximum)

> job-level configurable mapred.map.tasks.maximum and mapred.reduce.tasks.maximum 
> --------------------------------------------------------------------------------
>
>                 Key: HADOOP-4295
>                 URL: https://issues.apache.org/jira/browse/HADOOP-4295
>             Project: Hadoop Core
>          Issue Type: Improvement
>          Components: mapred
>            Reporter: Christian Kunz
>
> Right now mapred.tasktracker.map.tasks.maximum and mapred.tasktracker.reduce.tasks.maximum are set on the tasktracker level.
> In absense of a smart tasktracker monitoring resources and deciding in an adaptive manner how many tasks can be run simultaneously, it would be nice to move these two configuration options to the job level. This would make it easier to optimize the performance of a batch of jobs.

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.