You are viewing a plain text version of this content. The canonical link for it is here.
Posted to user@jmeter.apache.org by Guillaume Lucazeau <gl...@gmail.com> on 2011/06/01 22:47:19 UTC

Stop on criteria/save stats before end of test

Hello Jmeter users!

I am running some performance tests on a website: I got 2,000 users
(threads) sending GET requests on 20 random pages. I got a ramp-up of 45
seconds. Then at the beginning the number of threads slowly increase, and at
the end it slowly decreases.

When I run this test manually through the GUI, I usually save the data (and
then force the test top stop) when the number of threads start to decrease,
to keep the 90% line generated while the maximum number of threads were
running.

Now that I am going to run Jmeter tests with Maven, I would like to know how
to reproduce this behavior: can I control the current total of threads and
save a report when it decreases, or stop the test? Or do you have any
suggestion on this topic?

I made many researches, looked in the component reference but so far I
didn't find anything that could help.

Thank you for your help! :-)
Guillaume

Re: Stop on criteria/save stats before end of test

Posted by apc <ap...@apc.kg>.
Hi, look here: http://code.google.com/p/jmeter-plugins/wiki/AutoStop

--
View this message in context: http://jmeter.512774.n5.nabble.com/Stop-on-criteria-save-stats-before-end-of-test-tp4446383p4447844.html
Sent from the JMeter - User mailing list archive at Nabble.com.

---------------------------------------------------------------------
To unsubscribe, e-mail: jmeter-user-unsubscribe@jakarta.apache.org
For additional commands, e-mail: jmeter-user-help@jakarta.apache.org