You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Hadoop QA (JIRA)" <ji...@apache.org> on 2013/03/27 04:37:15 UTC

[jira] [Commented] (YARN-474) CapacityScheduler does not activate applications when maximum-am-resource-percent configuration is refreshed

    [ https://issues.apache.org/jira/browse/YARN-474?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13614882#comment-13614882 ] 

Hadoop QA commented on YARN-474:
--------------------------------

{color:green}+1 overall{color}.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12575633/YARN-474.3.patch
  against trunk revision .

    {color:green}+1 @author{color}.  The patch does not contain any @author tags.

    {color:green}+1 tests included{color}.  The patch appears to include 1 new or modified test files.

    {color:green}+1 javac{color}.  The applied patch does not increase the total number of javac compiler warnings.

    {color:green}+1 javadoc{color}.  The javadoc tool did not generate any warning messages.

    {color:green}+1 eclipse:eclipse{color}.  The patch built with eclipse:eclipse.

    {color:green}+1 findbugs{color}.  The patch does not introduce any new Findbugs (version 1.3.9) warnings.

    {color:green}+1 release audit{color}.  The applied patch does not increase the total number of release audit warnings.

    {color:green}+1 core tests{color}.  The patch passed unit tests in hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager.

    {color:green}+1 contrib tests{color}.  The patch passed contrib unit tests.

Test results: https://builds.apache.org/job/PreCommit-YARN-Build/613//testReport/
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/613//console

This message is automatically generated.
                
> CapacityScheduler does not activate applications when maximum-am-resource-percent configuration is refreshed
> ------------------------------------------------------------------------------------------------------------
>
>                 Key: YARN-474
>                 URL: https://issues.apache.org/jira/browse/YARN-474
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: capacityscheduler
>    Affects Versions: 2.0.3-alpha, 0.23.6
>            Reporter: Hitesh Shah
>            Assignee: Zhijie Shen
>         Attachments: YARN-474.1.patch, YARN-474.2.patch, YARN-474.3.patch
>
>
> Submit 3 applications to a cluster where capacity scheduler limits allow only 1 running application. Modify capacity scheduler config to increase value of yarn.scheduler.capacity.maximum-am-resource-percent and invoke refresh queues. 
> The 2 applications not yet in running state do not get launched even though limits are increased.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira