You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@nifi.apache.org by "Bryan Bende (JIRA)" <ji...@apache.org> on 2018/03/13 16:24:00 UTC
[jira] [Created] (NIFI-4969) Failed to import versioned flow when
processor uses "Event Driven" scheduling
Bryan Bende created NIFI-4969:
---------------------------------
Summary: Failed to import versioned flow when processor uses "Event Driven" scheduling
Key: NIFI-4969
URL: https://issues.apache.org/jira/browse/NIFI-4969
Project: Apache NiFi
Issue Type: Bug
Affects Versions: 1.5.0
Reporter: Bryan Bende
Assignee: Bryan Bende
Create a flow where a processor has scheduling strategy set to event-driven with concurrent tasks set to 0. Start version control on the flow, and them try to import a new process group using the flow from previous step.
The error is because during import we set the concurrent tasks value before the scheduling strategy, and StandardProcessorNode line 630 throws an exception if the tasks is < 1 and strategy is not event driven.
The exception also does not report any message so it is hard to figure out what the issue is.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)