You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ozone.apache.org by "Stephen O'Donnell (Jira)" <ji...@apache.org> on 2023/01/05 12:34:00 UTC
[jira] [Created] (HDDS-7726) EC: Enhance datanode reconstruction log message
Stephen O'Donnell created HDDS-7726:
---------------------------------------
Summary: EC: Enhance datanode reconstruction log message
Key: HDDS-7726
URL: https://issues.apache.org/jira/browse/HDDS-7726
Project: Apache Ozone
Issue Type: Sub-task
Reporter: Stephen O'Donnell
Assignee: Attila Doroszlai
I noticed the log message for the EC reconstruction commands on the datanodes looks like:
{code}
2023-01-04 23:57:41,092 INFO org.apache.hadoop.ozone.container.ec.reconstruction.ECReconstructionCoordinatorTask: Completed the EC reconstruction of the container 1
{code}
It would be useful if this log message also included the indexes and target DNs it has reconstructed, and perhaps the time it took to do the reconstruction task. Alternative a "starting reconstruction" would let us work out the time, but it would be more noise having 2 log messages rather than 1.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscribe@ozone.apache.org
For additional commands, e-mail: issues-help@ozone.apache.org