You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hive.apache.org by "Vineet Garg (JIRA)" <ji...@apache.org> on 2018/12/05 06:43:00 UTC
[jira] [Updated] (HIVE-21007) Semi join + Union can lead to wrong
plans
[ https://issues.apache.org/jira/browse/HIVE-21007?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Vineet Garg updated HIVE-21007:
-------------------------------
Attachment: HIVE-21007.1.patch
> Semi join + Union can lead to wrong plans
> -----------------------------------------
>
> Key: HIVE-21007
> URL: https://issues.apache.org/jira/browse/HIVE-21007
> Project: Hive
> Issue Type: Bug
> Reporter: Vineet Garg
> Assignee: Vineet Garg
> Priority: Major
> Attachments: HIVE-21007.1.patch
>
>
> Tez compiler has the ability to push JOIN within UNION (by replicating join on each branch). If this JOIN had a SJ branch outgoing (or incoming) it could mess up the plan and end up generating incorrect or wrong plan.
> As a safe measure any SJ branch after UNION should be removed (until we improve the logic to better handle SJ branches)
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)